References

  • All references
  • Finished
  • Ongoing
Industry • Finished

Biogas 2012

Installation of piping systems in a newly built biogas plant in Gothenburg for client Valmet...

Read more
Industry • Finished

Expansion project Södra Cell Värö 2016

Installation of piping systems district heating and secondary heating. Client Södra Cell AB.

Read more
Industry • Finished

Upgrade Mörrum SP3 Steg1 2020

Replacing feed water line DN200. Installation of new SÄV on the main line included associated...

Read more
Industry • Finished

Replacement of Steam lines Mönsterås 2020

Prefabrication of steam lines DN150-450 between boiler and turbine. Connection took place in 2021. Client...

Read more
Cold • Finished

Cold storage COOP Eskilstuna 2021

Installation of pipe systems in COOP´’s newly built freezer and cold storage in Eskilstuna. Client...

Read more
Cold • Finished

Dafgård climate change 2021-2022

Installation of pipe system…

Read more
Cold • Finished

Kylcentral Lindholmen 2012

Installation of pipe system…

Read more
Power & heat • Ongoing

Heat pump plant VA Syd Malmö 2017

Installation of pipe systems for district heating and wastewater in a newly built heat pump...

Read more
Power & heat • Ongoing

Pumping stations in Högbytorp, Säby, Kungsängen and Bro 2018

Installation of pipe systems for district heating in newly built pumping stations in Högbytorp, Säby...

Read more
Power & heat • Ongoing

Ash handling Sävenäs HP3 2018

Installation of a new system for handling fly ash at Sävenäsverket in Gothenburg. A turnkey...

Read more
Power & heat • Ongoing

Värmeverk Gamleby 2021

Pipe installations for new boiler P1 and replacement of boiler P3 as well as new...

Read more
Power & heat • Ongoing

HVAU Carpe Lot3 Uppsala 2021

Installation of piping systems for district heating, hot rail, low-pressure steam, compressed air, nitrogen gas...

Read more
Power & heat • Ongoing

Heat pumps Vestforbraending Glostrup 2021

Installation of district heating, cooling and condensate pipe systems for new heat pumps in Vestforbraending’s...

Read more
Petrochemistry • Ongoing

OFA and fire water pipes in Gothenburg’s oil port 2017

Installation of pipe systems for OFA and fire water pipes in the port of Gothenburg.

Read more
Petrochemistry • Ongoing

Thick oil pipeline P34-KAJ551 Gothenburg Oil Port 2017

Installation of a new heavy oil line DN300 in material P235GH in Gothenburg oil port....

Read more
Petrochemistry • Ongoing

Emptying system P4 Gothenburg Oil Port 2019

Replacement of pipelines for Petrol, Fuel Oil and Compressed Air in the Port of Gothenburg....

Read more
Water & sewer • Ongoing

EN2013 Air supply system treatment plant Gryaab 2015 / Relief line DN1200 Gryaab 2015

Complete delivery of 6 Sulzer blowers, pipes, primary forging, secondary forging, instruments and valves for...

Read more
Water & sewer • Ongoing

Blower plant ME02 Gryaab 2021

Process air system for AS basins. The contract included installation of 5 compressors, installation of...

Read more
Water & sewer • Ongoing

Pumpstation Teknikhus Göteborg 2019

Installation of pipe system in pumping station for drinking water. The contract included complete delivery...

Read more
Water & sewer • Finished

Drainage system The party hall connection “Red snakes” Gothenburg 2011

Manufacture and installation of fully welded drainage system for the Patrihalls connection bridge in Gothenburg....

Read more
Water & sewer • Finished

Drainage system Södra Marieholmsbron Gothenburg 2016-2017

Manufacture and installation of fully welded drainage system for Södra Marieholmsbron in Gothenburg. Pipe dimension...

Read more
Power & heat • Ongoing

Heat pump plant VA Syd Malmö 2017

Installation of pipe systems for district heating and wastewater in a newly built heat pump...

Read more
Power & heat • Ongoing

Pumping stations in Högbytorp, Säby, Kungsängen and Bro 2018

Installation of pipe systems for district heating in newly built pumping stations in Högbytorp, Säby...

Read more
Power & heat • Ongoing

Ash handling Sävenäs HP3 2018

Installation of a new system for handling fly ash at Sävenäsverket in Gothenburg. A turnkey...

Read more
Power & heat • Ongoing

Värmeverk Gamleby 2021

Pipe installations for new boiler P1 and replacement of boiler P3 as well as new...

Read more
Power & heat • Ongoing

HVAU Carpe Lot3 Uppsala 2021

Installation of piping systems for district heating, hot rail, low-pressure steam, compressed air, nitrogen gas...

Read more
Power & heat • Ongoing

Heat pumps Vestforbraending Glostrup 2021

Installation of district heating, cooling and condensate pipe systems for new heat pumps in Vestforbraending’s...

Read more
Petrochemistry • Ongoing

OFA and fire water pipes in Gothenburg’s oil port 2017

Installation of pipe systems for OFA and fire water pipes in the port of Gothenburg.

Read more
Petrochemistry • Ongoing

Thick oil pipeline P34-KAJ551 Gothenburg Oil Port 2017

Installation of a new heavy oil line DN300 in material P235GH in Gothenburg oil port....

Read more
Petrochemistry • Ongoing

Emptying system P4 Gothenburg Oil Port 2019

Replacement of pipelines for Petrol, Fuel Oil and Compressed Air in the Port of Gothenburg....

Read more
Water & sewer • Ongoing

EN2013 Air supply system treatment plant Gryaab 2015 / Relief line DN1200 Gryaab 2015

Complete delivery of 6 Sulzer blowers, pipes, primary forging, secondary forging, instruments and valves for...

Read more
Water & sewer • Ongoing

Blower plant ME02 Gryaab 2021

Process air system for AS basins. The contract included installation of 5 compressors, installation of...

Read more
Water & sewer • Ongoing

Pumpstation Teknikhus Göteborg 2019

Installation of pipe system in pumping station for drinking water. The contract included complete delivery...

Read more