Installation of pipe systems for district heating in newly built pumping stations in Högbytorp, Säby and Kungsängen. Reconstruction of heating plant in Bro. In Högbytorp, we also installed a stainless steel cooling system. The contract included the supply of valves and instruments for all facilities. Pipe dimensions DN15-500 in material P235GH and stainless steel 1.4307. Client E.ON Värme Sverige AB.
