Upgrade Mörrum SP3 Steg1 2020

Replacing feed water line DN200. Installation of new SÄV on the main line included associated muffler and control cabinet with impulse lines. Connection of main steam line DN350 to temporary container for steam blowing and restoration. Reconstruction of soot pipelines during stoppages. Client Valmet AB.